Redevelop

Codell · DJ Basin

API 05-013-12857 · CO · Drilled 1987 · 6,880 ft TD · Status: Marginal

72
Viability Score
Recommended Development Pathway
Enhanced Recovery — Waterflood
Estimated Incremental Recovery
10–17K bbl

Secondary recovery opportunity in Codell. Modest capital requirement, solid payout at current oil prices.

Six-Driver Viability Assessment · Avg 73/100

Reservoir Potential

74/100

Codell sandstone — pressure-supported waterflood potential. Decline history shows primary depletion complete; secondary recovery not attempted.

Wellbore Condition

76/100

Good integrity to TD. Compatible with injection conversion if needed.

Field Redevelopment

70/100

2-well waterflood pattern feasible with 1 existing shut-in well as potential injector.

Infrastructure Readiness

74/100

2.2 miles to gathering. SWD well 1.8 miles — existing permit.

Regulatory Clarity

72/100

Active operator. Injection permit pathway precedented in same township.

Environmental Profile

70/100

No issues on record. Standard Codell operations risk profile.

Formation and Fluid Data

Oil API Gravity
42.3 °API
Reservoir Pressure
2940 psi
Water Cut
61%
Casing Integrity
Good
Brine Lithium
7 ppm
Brine TDS
22K ppm
Infra. Proximity
2.2 mi
Total Depth
6,880 ft

AI Practitioner Analysis

Senior PE assessment generated from well data and methodology framework

⬡
Click Run AI Analysis to generate a practitioner-grade assessment for this Codell well in the DJ Basin.
SPE-PRMS Alignment. Viability scores and recovery estimates are aligned to the Society of Petroleum Engineers Petroleum Resources Management System (SPE-PRMS) classification framework. Estimates represent decision-support information and do not constitute a certified reserve report. Independent reserve reports from qualified petroleum engineering firms are available on engagement. All demonstration data is synthetic.
MotherLode Reservoir Demo