R
MotherLode Reservoir
← Back to Portfolio
Redevelop

Codell · DJ Basin

API 05-013-12857 · CO · Drilled 1987 · 6,880 ft TD · Status: Marginal

72
Viability Score
Recommended Development Pathway
Enhanced Recovery — Waterflood
Estimated Incremental Recovery
10–17K bbl

Secondary recovery opportunity in Codell. Modest capital requirement, solid payout at current oil prices.

Six-Driver Viability Assessment · Avg 73/100

Reservoir Potential

74/100

Codell sandstone — pressure-supported waterflood potential. Decline history shows primary depletion complete; secondary recovery not attempted.

Wellbore Condition

76/100

Good integrity to TD. Compatible with injection conversion if needed.

Field Redevelopment

70/100

2-well waterflood pattern feasible with 1 existing shut-in well as potential injector.

Infrastructure Readiness

74/100

2.2 miles to gathering. SWD well 1.8 miles — existing permit.

Regulatory Clarity

72/100

Active operator. Injection permit pathway precedented in same township.

Environmental Profile

70/100

No issues on record. Standard Codell operations risk profile.

Formation and Fluid Data

Oil API Gravity
42.3 °API
Reservoir Pressure
2940 psi
Water Cut
61%
Casing Integrity
Good
Brine Lithium
7 ppm
Brine TDS
22K ppm
Infra. Proximity
2.2 mi
Total Depth
6,880 ft

AI Practitioner Analysis

Senior PE assessment generated from well data and methodology framework

Click Run AI Analysis to generate a practitioner-grade assessment for this Codell well in the DJ Basin.
SPE-PRMS Alignment. Viability scores and recovery estimates are aligned to the Society of Petroleum Engineers Petroleum Resources Management System (SPE-PRMS) classification framework. Estimates represent decision-support information and do not constitute a certified reserve report. Independent reserve reports from qualified petroleum engineering firms are available on engagement. All demonstration data is synthetic.
MotherLode Reservoir Demo